Planned
Neocloud
Air cooled

TeraWulf Justified Data Campus

TeraWulf · Hancock County

Planned IT
480 MW
Remaining
—
$ / kW·mo
$76
White space
—

Inventory

0% occupied

Power

480 MWcampus

0 MW pipeline · 0 MW in use

White space

—total

— free

—

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live—
Remaining—
Utility feed—
Campus / planned480 MW

Power cost

$76/kW·mo

8¢ industrial · 10.4¢ after PUE —

Per MW·year
$911k
This site · 480 MW
$437M/yr
3.2¢ cheapdear 22.4¢

2.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $262M/yr less.

US industrial · utility tariff × PUE, not colo list price.

Redundancy
—
Opened
—
Renewable match
—
Rack density
—
Voltage
—
PUE
—1.00 ideal · 1.60 typical
Power source
—

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

—

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Cooling design not published by the operator for this site; typed air as the neutral default.

Network carriers

0

No on-net carriers published.

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

0

No public-cloud on-ramp published.

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Hawesville, Kentucky, United States

37.900°, -86.755° · North America

Notes

TeraWulf's 480 MW Justified Data campus in Hancock County, KY; the Kentucky PSC approved its electric service agreement in Aug 2026 (TeraWulf, May 26 and Oct 5 2026). Construction stage not verified; typed planned. Coordinates: Hawesville town center (approximate). Sources: https://investors.terawulf.com/news-events/press-releases/detail/141/terawulf-expands-infrastructure-platform-with-acquisition-of-1-gw-eastern-kentucky-hpc-campus https://investors.terawulf.com/news-events/press-releases/detail/146/terawulf-expands-contracted-power-capacity-at-its-muskie-data-campus-to-1-gw

Compiled from public filings, operator pages, and reporting. Not an official operator specification.