Expanding
Colocation
Liquid cooling
Tier III

Teraco JB4 Isando

Teraco (Digital Realty) · Johannesburg Campus

IT live
50 MW
Free to lease
30 MW
$ / kW·mo
$88
White space
208k ft²

Inventory

40% occupied

Power

50 MWlive

30 MW to lease · 20 MW in use

White space

208k ft²total

125k ft² free · 83k ft² occupied

19k m² · 12k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live50 MW
Free to lease30 MW
Utility feed100 MW
Campus / planned80 MW

About 50 MW of the utility feed is cooling, conversion, and house load.

Power cost

$88/kW·mo

9.4¢ industrial · 12¢ after PUE 1.28

Per MW·year
$1.1M
This site · 50 MW
$53M/yr
20 kW rack
$1,757/mo
3.2¢ cheapdear 22.4¢

2.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $35M/yr less.

Eskom Gauteng · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2024
Renewable match
40%
Rack density
20 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
Eskom plus Teraco 120 MW utility-scale solar PV.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

0.03 L/kWh

fleet avg · 2025 · 13k m³/yr at 50 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Teraco 2025 disclosure.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Johannesburg, Gauteng, South Africa

Isando, Johannesburg

-26.128°, 28.214° · Africa

Tenants / users

Hyperscale, AI, cloud — NAPAfrica

Notes

Newest Isando hall. Teraco >180 MW critical power across ZA. Solar project offsets load-shedding.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.