Operational
Colocation
Air cooled
Tier III

Teraco DB1 Durban

Teraco (Digital Realty) · Durban

IT live
8 MW
Free to lease
1.6 MW
$ / kW·mo
$102
White space
63k ft²

Inventory

80% occupied

Power

8 MWlive

1.6 MW to lease · 6.4 MW in use

White space

63k ft²total

13k ft² free · 50k ft² occupied

5,806 m² · 1,161 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live8 MW
Free to lease1.6 MW
Utility feed10 MW
Campus / planned8 MW

About 2 MW of the utility feed is cooling, conversion, and house load.

Power cost

$102/kW·mo

9.8¢ industrial · 13.9¢ after PUE 1.42

Per MW·year
$1.2M
This site · 8 MW
$9.8M/yr
6 kW rack
$610/mo
3.2¢ cheapdear 22.4¢

3.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $6.6M/yr less.

Eskom KZN · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2014
Renewable match
20%
Rack density
6 kW
Voltage
PUE
1.421.00 ideal · 1.60 typical
Power source
Eskom plus on-site diesel and solar. Extended runtime sized for load-shedding ride-through.

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

6 kW

H100-eq

WUE

0.03 L/kWh

fleet avg · 2025 · 2,102 m³/yr at 8 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Teraco 2025 disclosure.

Chilled-water CRAH, N+1. Liquid-ready suites offered on newer campus halls.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Durban, KwaZulu-Natal, South Africa

Durban, KwaZulu-Natal

-29.858°, 31.021° · Africa

Tenants / users

Networks, enterprise, subsea

Notes

Durban Teraco. East-coast subsea and EASSY/SEACOM adjacency.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.