Planned
Colocation
Liquid cooling
Tier III

TenPeaks South Takanini

TenPeaks · Takanini

Planned IT
40 MW
Free to lease
40 MW
$ / kW·mo
$79
White space
143k ft²

Inventory

0% occupied

Power

40 MWlive

40 MW to lease · 0 MW in use

White space

143k ft²total

143k ft² free · occupied

13k m² · 13k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease40 MW
Utility feed
Campus / planned40 MW

Power cost

$79/kW·mo

9.2¢ industrial · 10.9¢ after PUE 1.18

Per MW·year
$951k
This site · 40 MW
$38M/yr
25 kW rack
$1,981/mo
3.2¢ cheapdear 22.4¢

2.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $25M/yr less.

Vector / NZAS-linked · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2028
Renewable match
85%
Rack density
25 kW
Voltage
PUE
1.181.00 ideal · 1.60 typical
Power source
Vector / Transpower. Dual feeds plus on-site generators. ~85 percent renewable NZ grid.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

25 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Takanini, Auckland, New Zealand

Takanini, Auckland

-37.049°, 174.908° · Oceania

Tenants / users

Cloud, AI, wholesale

Notes

TenPeaks South campus. One of three consented Auckland large-scale sites in the 130 MW pipeline with Central (Aotea) and a north campus.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.