TenPeaks South Takanini
TenPeaks · Takanini
- Planned IT
- 40 MW
- Free to lease
- 40 MW
- $ / kW·mo
- $79
- White space
- 143k ft²
Inventory
0% occupiedPower
40 MWlive
40 MW to lease · 0 MW in use
White space
143k ft²total
143k ft² free · — occupied
13k m² · 13k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$79/kW·mo
9.2¢ industrial · 10.9¢ after PUE 1.18
- Per MW·year
- $951k
- This site · 40 MW
- $38M/yr
- 25 kW rack
- $1,981/mo
2.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $25M/yr less.
Vector / NZAS-linked · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2028
- Renewable match
- 85%
- Rack density
- 25 kW
- PUE
- 1.181.00 ideal · 1.60 typical
- Power source
- Vector / Transpower. Dual feeds plus on-site generators. ~85 percent renewable NZ grid.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
25 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Takanini, Auckland, New Zealand
Takanini, Auckland
-37.049°, 174.908° · Oceania
Tenants / users
Cloud, AI, wholesale
Notes
TenPeaks South campus. One of three consented Auckland large-scale sites in the 130 MW pipeline with Central (Aotea) and a north campus.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.