Operational
Hyperscale
Liquid cooling
Tier III

Tencent Tianjin

Tencent Cloud · Tianjin

IT live
40 MW
Remaining
20 MW
$ / kW·mo
$83
White space
179k ft²

Inventory

67% occupied

Power

60 MWcampus

20 MW to commission · 40 MW in use

White space

268k ft²total

89k ft² free · 179k ft² occupied

25k m² · 8,295 m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live40 MW
Remaining20 MW
Utility feed75 MW
Campus / planned60 MW

About 35 MW of the utility feed is cooling, conversion, and house load.

Power cost

$83/kW·mo

9.3¢ industrial · 11.3¢ after PUE 1.22

Per MW·year
$994k
This site · 40 MW
$40M/yr
18 kW rack
$1,491/mo
3.2¢ cheapdear 22.4¢

2.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $26M/yr less.

Tianjin industrial 35 kV+ · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2014
Renewable match
40%
Rack density
18 kW
PUE
1.221.00 ideal · 1.60 typical
Power source
State Grid / China Southern Grid. Dual municipal feeds.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

18 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

3

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Tianjin, Tianjin, China

Tianjin, China

39.340°, 117.360° · Asia

Tenants / users

Tencent Cloud

Notes

Tencent north China campus. Pair to Gui'an.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.