TELUS Kamloops AI Factory

TELUS · KIDC / Bunker Road

IT live
16 MW
Remaining
69 MW
$ / kW·mo
$54
White space
331k ft²

Inventory

19% occupied

Power

85 MWcampus

69 MW to commission · 16 MW in use

White space

1.8M ft²total

1.4M ft² free · 331k ft² occupied

163k m² · 133k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live16 MW
Remaining69 MW
Utility feed106 MW
Campus / planned85 MW

About 90 MW of the utility feed is cooling, conversion, and house load.

Power cost

$54/kW·mo

6.4¢ industrial · 7.4¢ after PUE 1.15

Per MW·year
$645k
This site · 16 MW
$10M/yr
30 kW rack
$1,612/mo
3.2¢ cheapdear 22.4¢

2.0× the cheapest market (Iceland Landsvirkjun). Same IT load there is $5.2M/yr less.

BC Hydro interior · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2014
Renewable match
98%
Rack density
30 kW
PUE
1.151.00 ideal · 1.60 typical
Power source
BC Hydro interior 138/230 kV. Dual feeds. Thompson / Peace hydro.

Cooling

Plant

Direct-to-chip

Liquid

Deployed

Rack density

30 kW

H100-eq

4k

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Advanced liquid cooling; TELUS cites materially lower water use than conventional halls. PUE 1.15 on the Super Internet Data Centre core.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Kamloops, British Columbia, Canada

1458 Bunker Road, Kamloops, BC V2C 0B5

50.670°, -120.365° · North America

Tenants / users

TELUS sovereign AI, Canadian enterprise

Notes

Tier III LEED-oriented Super Internet Data Centre (2014) expanding as the Kamloops AI Factory, online H2 2026. 85 MW BC Hydro block for the three-site BC cluster (Kamloops + two Vancouver halls), scaling past 150 MW by 2032. Near TRU; complements Bell AI Fabric Kamloops without being the 500 MW Bell book.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.