Telia Tallinn
Telia Eesti · Tallinn
- IT live
- 6 MW
- Free to lease
- 0.8 MW
- $ / kW·mo
- $100
- White space
- 78k ft²
Inventory
86% occupiedPower
6 MWlive
0.8 MW to lease · 5.2 MW in use
White space
78k ft²total
5,250 ft² free · 73k ft² occupied
7,258 m² · 488 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 6.5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$100/kW·mo
10.4¢ industrial · 13.7¢ after PUE 1.32
- Per MW·year
- $1.2M
- This site · 6 MW
- $7.2M/yr
- 10 kW rack
- $1,002/mo
3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $5M/yr less.
Nord Pool EE · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2013
- Renewable match
- 50%
- Rack density
- 10 kW
- PUE
- 1.321.00 ideal · 1.60 typical
- Power source
- Elering. Dual 10 kV. Nord Pool Baltic; Estonian shale-to-renewables mix.
Cooling
Plant
Free air
Liquid
Not deployed
Rack density
10 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Free-air economization in the shoulder seasons. Closed-loop dry coolers.
Network carriers
3On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Tallinn, Harju, Estonia
Tallinn
59.437°, 24.754° · Europe
Tenants / users
Telia cloud, enterprise, government, TLD.ee
Notes
Estonian incumbent. e-government and NATO-adjacent workloads. Nord Pool Baltic cheap off-peak. Cold-climate free-air.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.