Expanding
Colocation
Air cooled
Tier III

Telia Tallinn

Telia Eesti · Tallinn

IT live
6 MW
Free to lease
0.8 MW
$ / kW·mo
$100
White space
78k ft²

Inventory

86% occupied

Power

6 MWlive

0.8 MW to lease · 5.2 MW in use

White space

78k ft²total

5,250 ft² free · 73k ft² occupied

7,258 m² · 488 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live6 MW
Free to lease0.8 MW
Utility feed12.5 MW
Campus / planned10 MW

About 6.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$100/kW·mo

10.4¢ industrial · 13.7¢ after PUE 1.32

Per MW·year
$1.2M
This site · 6 MW
$7.2M/yr
10 kW rack
$1,002/mo
3.2¢ cheapdear 22.4¢

3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $5M/yr less.

Nord Pool EE · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2013
Renewable match
50%
Rack density
10 kW
Voltage
PUE
1.321.00 ideal · 1.60 typical
Power source
Elering. Dual 10 kV. Nord Pool Baltic; Estonian shale-to-renewables mix.

Cooling

Plant

Free air

Liquid

Not deployed

Rack density

10 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Free-air economization in the shoulder seasons. Closed-loop dry coolers.

Network carriers

3

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Tallinn, Harju, Estonia

Tallinn

59.437°, 24.754° · Europe

Tenants / users

Telia cloud, enterprise, government, TLD.ee

Notes

Estonian incumbent. e-government and NATO-adjacent workloads. Nord Pool Baltic cheap off-peak. Cold-climate free-air.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.