Telehouse Paris Magny 2
Telehouse (KDDI) · TH3 Magny
- IT live
- 6 MW
- Free to lease
- 0.7 MW
- $ / kW·mo
- $97
- White space
- 128k ft²
Inventory
89% occupiedPower
6 MWlive
0.7 MW to lease · 5.3 MW in use
White space
128k ft²total
3,750 ft² free · 124k ft² occupied
12k m² · 348 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 16.5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$97/kW·mo
10.4¢ industrial · 13.3¢ after PUE 1.28
- Per MW·year
- $1.2M
- This site · 6 MW
- $7M/yr
- 12 kW rack
- $1,166/mo
3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $4.8M/yr less.
France Enedis / Ile-de-France · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2023
- Renewable match
- 90%
- Rack density
- 12 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- RTE / Enedis. Dual MV inlets plus on-site diesel. Nuclear-heavy French grid (ARENH).
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
12 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Magny-les-Hameaux, Île-de-France, France
TH3 Magny 2, Magny-les-Hameaux
48.736°, 2.075° · Europe
Tenants / users
Sovereign AI, 3DS Outscale, enterprise, cloud
Notes
Five-hall Magny 2. 18 MW / 12,000 sqm end-state. 3 MW liquid phase live 2025. Telehouse 1 billion euro French program includes a Marseille campus not yet in the index.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.