Planned
Colocation
Liquid cooling
Tier III

TECfusions Chile

TECfusions · Santiago

Planned IT
100 MW
Free to lease
100 MW
$ / kW·mo
$78
White space
250k ft²

Inventory

0% occupied

Power

100 MWlive

100 MW to lease · 0 MW in use

White space

250k ft²total

250k ft² free · occupied

23k m² · 23k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease100 MW
Utility feed
Campus / planned100 MW

Power cost

$78/kW·mo

industrial · 10.6¢ after PUE 1.18

Per MW·year
$930k
This site · 100 MW
$93M/yr
40 kW rack
$3,101/mo
3.2¢ cheapdear 22.4¢

2.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $60M/yr less.

Chile SIC · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2028
Renewable match
80%
Rack density
40 kW
PUE
1.181.00 ideal · 1.60 typical
Power source
Chile grid plus on-site desalination for cooling water.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

40 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Liquid cooling plus on-site desalination targeting WUE < 0.2 L/kWh.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Santiago, Santiago Metropolitan, Chile

Santiago Metropolitan Region

-33.500°, -70.750° · South America

Tenants / users

Hyperscale, AI

Notes

100 MW Chilean campus pairing liquid cooling with desalination in a water-stressed metro.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.