TCC Taichung DC
Taiwan Cement / TCC · Taichung
- Planned IT
- 40 MW
- Free to lease
- 32 MW
- $ / kW·mo
- $80
- White space
- 100k ft²
Inventory
20% occupiedPower
40 MWlive
32 MW to lease · 8 MW in use
White space
100k ft²total
80k ft² free · 20k ft² occupied
9,290 m² · 7,432 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$80/kW·mo
9.1¢ industrial · 10.9¢ after PUE 1.20
- Per MW·year
- $957k
- This site · 40 MW
- $38M/yr
- 40 kW rack
- $3,189/mo
2.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $25M/yr less.
Taipower · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2027
- Renewable match
- 25%
- Rack density
- 40 kW
- PUE
- 1.201.00 ideal · 1.60 typical
- Power source
- Taipower. Dual feeds. Seismic design.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
40 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Direct-to-chip cold plates and rear-door heat exchangers. Designed for GB200/Blackwell-class racks.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
3Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Taichung, Taichung, Taiwan
Taichung, Taiwan
24.200°, 120.600° · Asia
Tenants / users
Hyperscale, AI pipeline
Notes
TCC (Taiwan Cement) energy-adjacent DC. Behind-the-meter industrial power thesis.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.