Under construction
Colocation
Liquid cooling
Tier III

TCC Taichung DC

Taiwan Cement / TCC · Taichung

Planned IT
40 MW
Free to lease
32 MW
$ / kW·mo
$80
White space
100k ft²

Inventory

20% occupied

Power

40 MWlive

32 MW to lease · 8 MW in use

White space

100k ft²total

80k ft² free · 20k ft² occupied

9,290 m² · 7,432 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease32 MW
Utility feed
Campus / planned40 MW

Power cost

$80/kW·mo

9.1¢ industrial · 10.9¢ after PUE 1.20

Per MW·year
$957k
This site · 40 MW
$38M/yr
40 kW rack
$3,189/mo
3.2¢ cheapdear 22.4¢

2.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $25M/yr less.

Taipower · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2027
Renewable match
25%
Rack density
40 kW
Voltage
PUE
1.201.00 ideal · 1.60 typical
Power source
Taipower. Dual feeds. Seismic design.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

40 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Direct-to-chip cold plates and rear-door heat exchangers. Designed for GB200/Blackwell-class racks.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

3

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Taichung, Taichung, Taiwan

Taichung, Taiwan

24.200°, 120.600° · Asia

Tenants / users

Hyperscale, AI pipeline

Notes

TCC (Taiwan Cement) energy-adjacent DC. Behind-the-meter industrial power thesis.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.