Takoda Sumaré
Takoda · Sumaré
- Planned IT
- 96 MW
- Free to lease
- 96 MW
- $ / kW·mo
- $92
- White space
- 343k ft²
Inventory
0% occupiedPower
96 MWlive
96 MW to lease · 0 MW in use
White space
343k ft²total
343k ft² free · — occupied
32k m² · 32k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$92/kW·mo
9.8¢ industrial · 12.5¢ after PUE 1.28
- Per MW·year
- $1.1M
- This site · 96 MW
- $105M/yr
- 25 kW rack
- $2,289/mo
3.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $71M/yr less.
CPFL Campinas · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2029
- Renewable match
- 80%
- Rack density
- 25 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- CPFL Campinas. Dual feeds plus on-site diesel. Interior São Paulo industrial corridor.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
25 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Direct-to-chip cold plates and rear-door HX. Designed for 40 kW-plus AI racks.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Sumaré, São Paulo, Brazil
Sumaré, São Paulo
-22.822°, -47.267° · South America
Tenants / users
Hyperscale pipeline
Notes
96 MW planned campus, first 16 MW. Part of Monte Capital's 160 MW Takoda build-out with a 64 MW Rio sister site. CADE clearance still in flight.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.