Takoda Sumaré

Takoda · Sumaré

Planned IT
96 MW
Free to lease
96 MW
$ / kW·mo
$92
White space
343k ft²

Inventory

0% occupied

Power

96 MWlive

96 MW to lease · 0 MW in use

White space

343k ft²total

343k ft² free · — occupied

32k m² · 32k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live—
Free to lease96 MW
Utility feed—
Campus / planned96 MW

Power cost

$92/kW·mo

9.8¢ industrial · 12.5¢ after PUE 1.28

Per MW·year
$1.1M
This site · 96 MW
$105M/yr
25 kW rack
$2,289/mo
3.2¢ cheapdear 22.4¢

3.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $71M/yr less.

CPFL Campinas · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2029
Renewable match
80%
Rack density
25 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
CPFL Campinas. Dual feeds plus on-site diesel. Interior São Paulo industrial corridor.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

25 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Direct-to-chip cold plates and rear-door HX. Designed for 40 kW-plus AI racks.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Sumaré, São Paulo, Brazil

Sumaré, São Paulo

-22.822°, -47.267° · South America

Tenants / users

Hyperscale pipeline

Notes

96 MW planned campus, first 16 MW. Part of Monte Capital's 160 MW Takoda build-out with a 64 MW Rio sister site. CADE clearance still in flight.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.