Operational
Colocation
Air cooled
Tier III

Takoda São Paulo SP01

Takoda · São Paulo

IT live
6 MW
Free to lease
1.0 MW
$ / kW·mo
$101
White space
59k ft²

Inventory

84% occupied

Power

6 MWlive

1.0 MW to lease · 5.0 MW in use

White space

59k ft²total

7,500 ft² free · 51k ft² occupied

5,444 m² · 697 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live6 MW
Free to lease1.0 MW
Utility feed7.5 MW
Campus / planned6 MW

About 1.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$101/kW·mo

10.8¢ industrial · 13.8¢ after PUE 1.28

Per MW·year
$1.2M
This site · 6 MW
$7.3M/yr
6 kW rack
$605/mo
3.2¢ cheapdear 22.4¢

3.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $5.1M/yr less.

Enel SP · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2014
Renewable match
80%
Rack density
6 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
Enel SP / CPFL. Dual feeds plus on-site diesel. Hydro-heavy Brazilian grid.

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

6 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Chilled-water CRAH, N+1. Tropical wet-bulb; evaporative hours limited. High-density cabinets where water and power allow.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

São Paulo, São Paulo, Brazil

São Paulo, Brazil

-23.548°, -46.638° · South America

Tenants / users

Petrobras, TIM, BNDES, enterprise

Notes

Tivit spin-out (2023). 100 percent renewable. Monte Capital buying from Apax in 2026 with a 160 MW expansion plan.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.