Expanding
Colocation
Liquid cooling
Tier III

T5 Las Vegas

T5 Data Centers · LAS

IT live
28 MW
Free to lease
3.4 MW
$ / kW·mo
$68
White space
250k ft²

Inventory

88% occupied

Power

28 MWlive

3.4 MW to lease · 24.6 MW in use

White space

250k ft²total

14k ft² free · 236k ft² occupied

23k m² · 1,301 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live28 MW
Free to lease3.4 MW
Utility feed60 MW
Campus / planned48 MW

About 32 MW of the utility feed is cooling, conversion, and house load.

Power cost

$68/kW·mo

7.4¢ industrial · 9.3¢ after PUE 1.25

Per MW·year
$810k
This site · 28 MW
$23M/yr
20 kW rack
$1,351/mo
3.2¢ cheapdear 22.4¢

2.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $13M/yr less.

NV Energy · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2018
Renewable match
50%
Rack density
20 kW
PUE
1.251.00 ideal · 1.60 typical
Power source
NV Energy. Dual feeds. Renewable PPA overlay on the Nevada grid.

Cooling

Plant

Evaporative

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Closed-loop dry coolers / adiabatic. Water-light desert or zero-WUE design.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Las Vegas, Nevada, United States

Las Vegas, NV

36.148°, -115.162° · North America

Tenants / users

Hyperscale, cloud, enterprise

Notes

Las Vegas T5 wholesale. Complements Switch SuperNAP already in the index. Not an IBX.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.