T5 Las Vegas
T5 Data Centers · LAS
- IT live
- 28 MW
- Free to lease
- 3.4 MW
- $ / kW·mo
- $68
- White space
- 250k ft²
Inventory
88% occupiedPower
28 MWlive
3.4 MW to lease · 24.6 MW in use
White space
250k ft²total
14k ft² free · 236k ft² occupied
23k m² · 1,301 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 32 MW of the utility feed is cooling, conversion, and house load.
Power cost
$68/kW·mo
7.4¢ industrial · 9.3¢ after PUE 1.25
- Per MW·year
- $810k
- This site · 28 MW
- $23M/yr
- 20 kW rack
- $1,351/mo
2.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $13M/yr less.
NV Energy · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2018
- Renewable match
- 50%
- Rack density
- 20 kW
- PUE
- 1.251.00 ideal · 1.60 typical
- Power source
- NV Energy. Dual feeds. Renewable PPA overlay on the Nevada grid.
Cooling
Plant
Evaporative
Liquid
Deployed
Rack density
20 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Closed-loop dry coolers / adiabatic. Water-light desert or zero-WUE design.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Las Vegas, Nevada, United States
Las Vegas, NV
36.148°, -115.162° · North America
Tenants / users
Hyperscale, cloud, enterprise
Notes
Las Vegas T5 wholesale. Complements Switch SuperNAP already in the index. Not an IBX.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.