Switch The Keep Atlanta
Switch · The Keep

- IT live
- 90 MW
- Free to lease
- 10.8 MW
- $ / kW·mo
- $80
- White space
- 670k ft²
Inventory
88% occupiedPower
90 MWlive
10.8 MW to lease · 79.2 MW in use
White space
670k ft²total
39k ft² free · 631k ft² occupied
62k m² · 3,583 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 97.5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$80/kW·mo
8.6¢ industrial · 11¢ after PUE 1.28
- Per MW·year
- $964k
- This site · 90 MW
- $87M/yr
- 25 kW rack
- $2,009/mo
2.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $54M/yr less.
Georgia Power · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2016
- Renewable match
- 90%
- Rack density
- 25 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- Georgia Power. Dual 230 kV. Renewable PPAs.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
25 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Lithia Springs, Georgia, United States
Lithia Springs, GA
33.749°, -84.619° · North America
Tenants / users
Hyperscale, cloud, enterprise
Notes
Atlanta SuperNAP / The Keep. Third Switch exascale campus after Las Vegas SuperNAP and Citadel (already in the index).
Compiled from public filings, operator pages, and reporting. Not an official operator specification.