Expanding
Colocation
Liquid cooling
Tier III

Switch The Keep Atlanta

Switch · The Keep

Switch The Keep Atlanta facility
Switch · Source
IT live
90 MW
Free to lease
10.8 MW
$ / kW·mo
$80
White space
670k ft²

Inventory

88% occupied

Power

90 MWlive

10.8 MW to lease · 79.2 MW in use

White space

670k ft²total

39k ft² free · 631k ft² occupied

62k m² · 3,583 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live90 MW
Free to lease10.8 MW
Utility feed188 MW
Campus / planned150 MW

About 97.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$80/kW·mo

8.6¢ industrial · 11¢ after PUE 1.28

Per MW·year
$964k
This site · 90 MW
$87M/yr
25 kW rack
$2,009/mo
3.2¢ cheapdear 22.4¢

2.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $54M/yr less.

Georgia Power · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2016
Renewable match
90%
Rack density
25 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
Georgia Power. Dual 230 kV. Renewable PPAs.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

25 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Lithia Springs, Georgia, United States

Lithia Springs, GA

33.749°, -84.619° · North America

Tenants / users

Hyperscale, cloud, enterprise

Notes

Atlanta SuperNAP / The Keep. Third Switch exascale campus after Las Vegas SuperNAP and Citadel (already in the index).

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.