Switch SuperNAP Las Vegas
Switch · SuperNAP

- IT live
- 130 MW
- Free to lease
- 15.6 MW
- $ / kW·mo
- $73
- White space
- 903k ft²
Inventory
88% occupiedPower
130 MWlive
15.6 MW to lease · 114 MW in use
White space
903k ft²total
108k ft² free · 794k ft² occupied
84k m² · 10k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 30 MW of the utility feed is cooling, conversion, and house load.
Power cost
$73/kW·mo
8¢ industrial · 10¢ after PUE 1.25
- Per MW·year
- $876k
- This site · 130 MW
- $114M/yr
- 8 kW rack
- $584/mo
2.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $68M/yr less.
NV Energy · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2008
- Renewable match
- 100%
- Rack density
- 8 kW
- PUE
- 1.251.00 ideal · 1.60 typical
- Power source
- NV Energy, 100% renewable matched.
Cooling
Plant
Evaporative
Liquid
Not deployed
Rack density
8 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Switch SUPERNAP evaporative and outside-air economization. Liquid-ready cabinets offered in newer halls.
Network carriers
3On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
3Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Las Vegas, Nevada, United States
Las Vegas, NV
36.082°, -115.172° · North America
Tenants / users
Multi-tenant, cloud
Notes
The original SuperNAP. Tier IV design, 100% renewable matching.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.