Expanding
Colocation
Liquid cooling
Tier III

Switch Pyramid Grand Rapids

Switch · The Pyramid

Switch Pyramid Grand Rapids facility
Switch · Source
IT live
80 MW
Free to lease
9.6 MW
$ / kW·mo
$73
White space
625k ft²

Inventory

88% occupied

Power

80 MWlive

9.6 MW to lease · 70.4 MW in use

White space

625k ft²total

34k ft² free · 591k ft² occupied

58k m² · 3,185 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live80 MW
Free to lease9.6 MW
Utility feed175 MW
Campus / planned140 MW

About 95 MW of the utility feed is cooling, conversion, and house load.

Power cost

$73/kW·mo

7.8¢ industrial · 10¢ after PUE 1.28

Per MW·year
$875k
This site · 80 MW
$70M/yr
25 kW rack
$1,822/mo
3.2¢ cheapdear 22.4¢

2.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $41M/yr less.

Consumers Energy · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2019
Renewable match
80%
Rack density
25 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
Consumers Energy / ITC. Dual feeds. Michigan peninsula grid.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

25 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Grand Rapids, Michigan, United States

Grand Rapids, MI

42.963°, -85.668° · North America

Tenants / users

Hyperscale, cloud, Midwest wholesale

Notes

Michigan exascale campus. DigitalBridge/IFM Switch. Cheap Midwest power vs Northern Virginia.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.