Switch Citadel Campus

Switch · Citadel

Switch Citadel Campus facility
Switch · Source
IT live
130 MW
Free to lease
15.6 MW
$ / kW·mo
$64
White space
813k ft²

Inventory

88% occupied

Power

130 MWlive

15.6 MW to lease · 114 MW in use

White space

813k ft²total

98k ft² free · 715k ft² occupied

75k m² · 9,058 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live130 MW
Free to lease15.6 MW
Utility feed150 MW
Campus / planned150 MW

About 20 MW of the utility feed is cooling, conversion, and house load.

Power cost

$64/kW·mo

7.4¢ industrial · 8.7¢ after PUE 1.18

Per MW·year
$765k
This site · 130 MW
$99M/yr
10 kW rack
$637/mo
3.2¢ cheapdear 22.4¢

2.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $56M/yr less.

NV Energy North · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2017
Renewable match
100%
Rack density
10 kW
PUE
1.181.00 ideal · 1.60 typical
Power source
NV Energy plus on-site solar.

Cooling

Plant

Evaporative

Liquid

Not deployed

Rack density

10 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

High-efficiency evaporative cooling in the high desert. Dry climate favors water-side economizers.

Network carriers

3

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

3

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Sparks, Nevada, United States

Tahoe Reno Industrial Center, Sparks, NV

39.541°, -119.537° · North America

Tenants / users

Multi-tenant

Notes

Tahoe Reno industrial center. Switch markets 100% renewable across the Citadel campus.