Switch Citadel Campus
Switch · Citadel

- IT live
- 130 MW
- Free to lease
- 15.6 MW
- $ / kW·mo
- $64
- White space
- 813k ft²
Inventory
88% occupiedPower
130 MWlive
15.6 MW to lease · 114 MW in use
White space
813k ft²total
98k ft² free · 715k ft² occupied
75k m² · 9,058 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 20 MW of the utility feed is cooling, conversion, and house load.
Power cost
$64/kW·mo
7.4¢ industrial · 8.7¢ after PUE 1.18
- Per MW·year
- $765k
- This site · 130 MW
- $99M/yr
- 10 kW rack
- $637/mo
2.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $56M/yr less.
NV Energy North · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2017
- Renewable match
- 100%
- Rack density
- 10 kW
- PUE
- 1.181.00 ideal · 1.60 typical
- Power source
- NV Energy plus on-site solar.
Cooling
Plant
Evaporative
Liquid
Not deployed
Rack density
10 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
High-efficiency evaporative cooling in the high desert. Dry climate favors water-side economizers.
Network carriers
3On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
3Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Sparks, Nevada, United States
Tahoe Reno Industrial Center, Sparks, NV
39.541°, -119.537° · North America
Tenants / users
Multi-tenant
Notes
Tahoe Reno industrial center. Switch markets 100% renewable across the Citadel campus.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.