Switch Datacenters AMS6 Schiphol
Switch Datacenters · Schiphol greenhouse belt
- Planned IT
- 83 MW
- Free to lease
- 83 MW
- $ / kW·mo
- $122
- White space
- 208k ft²
Inventory
0% occupiedPower
83 MWlive
83 MW to lease · 0 MW in use
White space
208k ft²total
208k ft² free · — occupied
19k m² · 19k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$122/kW·mo
15.2¢ industrial · 16.7¢ after PUE 1.10
- Per MW·year
- $1.5M
- This site · 83 MW
- $122M/yr
- 40 kW rack
- $4,882/mo
4.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $96M/yr less.
Schiphol-Rijk / Liander · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2028
- Renewable match
- 100%
- Rack density
- 40 kW
- PUE
- 1.101.00 ideal · 1.60 typical
- Power source
- TenneT / Liander. Dual MV inlets plus on-site diesel. Dutch wind-plus-gas mix; DDA halls buy 100 percent certified green power.
Cooling
Plant
Direct-to-chip
Liquid
Deployed
Rack density
40 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Direct-to-chip plus waste-heat to 50-plus adjacent greenhouses.
Network carriers
10On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Aalsmeer, North Holland, Netherlands
Greenhouse belt south of Schiphol-Rijk
52.258°, 4.763° · Europe
Tenants / users
Wholesale AI, hyperscale
Notes
Modular 42 MW in 2028, 83 MW phase 2, 110 MW after 2030. Heat reuse into Westland-style glass. One of two Dutch operators driving most of the published Amsterdam pipeline with CloudHQ.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.