Switch Datacenters AMS2 Woerden
Switch Datacenters · Woerden
- IT live
- 5 MW
- Free to lease
- 0.5 MW
- $ / kW·mo
- $142
- White space
- 57k ft²
Inventory
91% occupiedPower
5 MWlive
0.5 MW to lease · 4.5 MW in use
White space
57k ft²total
2,557 ft² free · 54k ft² occupied
5,279 m² · 238 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$142/kW·mo
15.2¢ industrial · 19.5¢ after PUE 1.28
- Per MW·year
- $1.7M
- This site · 5 MW
- $8.5M/yr
- 12 kW rack
- $1,704/mo
4.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $6.7M/yr less.
Utrecht industrial · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2012
- Renewable match
- 100%
- Rack density
- 12 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- TenneT / Liander. Dual MV inlets plus on-site diesel. Dutch wind-plus-gas mix; DDA halls buy 100 percent certified green power.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
12 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
10On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Woerden, Utrecht, Netherlands
Polanerbaan 1, 3447 GN Woerden
52.085°, 4.883° · Europe
Tenants / users
Enterprise, DR, AI colo — 50 kW cabinets with DLC
Notes
Former bank DR hall on a different grid island from Amsterdam. 5.5 ha, 1,370 sqm live toward 3,370. Dual-site to AMS3 Zuidoost without sharing Liander constraint.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.