SUPERNAP Thailand

SUPERNAP Thailand · Chonburi

IT live
30 MW
Free to lease
5.4 MW
$ / kW·mo
$96
White space
375k ft²

Inventory

82% occupied

Power

30 MWlive

5.4 MW to lease · 24.6 MW in use

White space

375k ft²total

27k ft² free · 348k ft² occupied

35k m² · 2,508 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live30 MW
Free to lease5.4 MW
Utility feed75 MW
Campus / planned60 MW

About 45 MW of the utility feed is cooling, conversion, and house load.

Power cost

$96/kW·mo

10¢ industrial · 13.2¢ after PUE 1.32

Per MW·year
$1.2M
This site · 30 MW
$35M/yr
15 kW rack
$1,445/mo
3.2¢ cheapdear 22.4¢

3.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $24M/yr less.

MEA / PEA · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2019
Renewable match
20%
Rack density
15 kW
PUE
1.321.00 ideal · 1.60 typical
Power source
MEA / PEA / EGAT. Dual feeds plus on-site generators.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

15 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Si Racha, Chonburi, Thailand

Si Racha, Chonburi, Eastern Economic Corridor

13.175°, 100.931° · Asia

Tenants / users

Hyperscale, cloud, enterprise — Switch design

Notes

Switch SUPERNAP design in the EEC. 60 MW campus. Complements STT Bangkok; EEC is STT's stated next 50 MW site.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.