Planned
Colocation
Liquid cooling
Tier III

STT Jurong Island

STT GDC · Jurong Island

Planned IT
50 MW
Free to lease
50 MW
$ / kW·mo
$183
White space
125k ft²

Inventory

0% occupied

Power

50 MWlive

50 MW to lease · 0 MW in use

White space

125k ft²total

125k ft² free · occupied

12k m² · 12k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease50 MW
Utility feed
Campus / planned50 MW

Power cost

$183/kW·mo

21.2¢ industrial · 25¢ after PUE 1.18

Per MW·year
$2.2M
This site · 50 MW
$110M/yr
40 kW rack
$7,305/mo
3.2¢ cheapdear 22.4¢

6.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $93M/yr less.

Singapore EMA · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2029
Renewable match
55%
Rack density
40 kW
Voltage
PUE
1.181.00 ideal · 1.60 typical
Power source
SP Group. Dual feeds plus on-site generators. Capacity still gated by IMDA/EDB CFA awards.

Cooling

Plant

Direct-to-chip

Liquid

Deployed

Rack density

40 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Direct-to-chip cold plates and rear-door heat exchangers. Designed for GB200/Blackwell-class racks.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Singapore, Singapore, Singapore

Jurong Island data centre park, Singapore

1.266°, 103.703° · Asia

Tenants / users

Hyperscale, AI — CFA2 award

Notes

50 MW awarded Aug 2026 under IMDA/EDB DC-CFA2. Seventh STT Singapore building. Must power more than half the load from eligible green pathways (biomethane, ammonia, hydrogen, BIPV).

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.