Planned
Colocation
Liquid cooling
Tier III

STT Jakarta 5 Cikarang

STT GDC · GIIC Bekasi

Planned IT
40 MW
Free to lease
40 MW
$ / kW·mo
$82
White space
125k ft²

Inventory

0% occupied

Power

40 MWlive

40 MW to lease · 0 MW in use

White space

125k ft²total

125k ft² free · occupied

12k m² · 12k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease40 MW
Utility feed
Campus / planned40 MW

Power cost

$82/kW·mo

9.2¢ industrial · 11.2¢ after PUE 1.22

Per MW·year
$983k
This site · 40 MW
$39M/yr
30 kW rack
$2,458/mo
3.2¢ cheapdear 22.4¢

2.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $26M/yr less.

PLN · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2027
Renewable match
20%
Rack density
30 kW
PUE
1.221.00 ideal · 1.60 typical
Power source
PLN. Dual municipal feeds plus on-site generators.

Cooling

Plant

Direct-to-chip

Liquid

Deployed

Rack density

30 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Direct-to-chip cold plates and rear-door heat exchangers. Designed for GB200/Blackwell-class racks.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Cikarang, West Java, Indonesia

GIIC Deltamas, Cikarang, Bekasi

-6.327°, 107.157° · Asia

Tenants / users

Hyperscale, AI

Notes

Broke ground 2026 with Jakarta 6. Each 40 MW. Campus pipeline lists Jakarta 7–9 at 60 MW apiece.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.