Operational
Colocation
Liquid cooling
Tier III

STT Jakarta 2 Cikarang

STT GDC · GIIC Bekasi

IT live
24 MW
Free to lease
4.3 MW
$ / kW·mo
$89
White space
150k ft²

Inventory

82% occupied

Power

24 MWlive

4.3 MW to lease · 19.7 MW in use

White space

150k ft²total

22k ft² free · 128k ft² occupied

14k m² · 2,007 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live24 MW
Free to lease4.3 MW
Utility feed30 MW
Campus / planned24 MW

About 6 MW of the utility feed is cooling, conversion, and house load.

Power cost

$89/kW·mo

9.2¢ industrial · 12.1¢ after PUE 1.32

Per MW·year
$1.1M
This site · 24 MW
$26M/yr
15 kW rack
$1,330/mo
3.2¢ cheapdear 22.4¢

2.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $17M/yr less.

PLN · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2026
Renewable match
20%
Rack density
15 kW
Voltage
PUE
1.321.00 ideal · 1.60 typical
Power source
PLN. Dual municipal feeds plus on-site generators.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

15 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Cikarang, West Java, Indonesia

GIIC Deltamas, Cikarang, Bekasi

-6.323°, 107.151° · Asia

Tenants / users

Hyperscale, cloud, AI

Notes

Live June 2026. 24 MW. Broke ground Sep 2024. Campus scaling toward nine buildings and 360 MW.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.