Under construction
Colocation
Liquid cooling
Tier III

STT Fairview 1

STT GDC Philippines · Fairview

Planned IT
16 MW
Free to lease
16 MW
$ / kW·mo
$125
White space
80k ft²

Inventory

0% occupied

Power

16 MWlive

16 MW to lease · 0 MW in use

White space

80k ft²total

80k ft² free · occupied

7,432 m² · 7,432 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease16 MW
Utility feed
Campus / planned16 MW

Power cost

$125/kW·mo

12.4¢ industrial · 17.1¢ after PUE 1.38

Per MW·year
$1.5M
This site · 16 MW
$24M/yr
15 kW rack
$1,874/mo
3.2¢ cheapdear 22.4¢

3.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $18M/yr less.

Meralco / NGCP · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2026
Renewable match
20%
Rack density
15 kW
PUE
1.381.00 ideal · 1.60 typical
Power source
Meralco / NGCP. Dual feeds plus on-site generators. Typhoon-rated plant.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

15 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

3

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Quezon City, Metro Manila, Philippines

Fairview, Quezon City

14.709°, 121.070° · Asia

Tenants / users

Cloud, enterprise, Globe / Ayala JV

Notes

STT + Globe + Ayala JV. Structure and Level 1 halls complete; Level 2 commissioning. Platform targeting more than 30 MW with Cavite 2 in 2026.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.