Expanding
Colocation
Liquid cooling
Tier III

STT Chennai 7 Siruseri

STT GDC · Siruseri

IT live
7.2 MW
Free to lease
27.6 MW
$ / kW·mo
$88
White space
18k ft²

Inventory

0% occupied

Power

7.2 MWlive

27.6 MW to lease · 0 MW in use

White space

18k ft²total

69k ft² free · occupied

1,672 m² · 6,413 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live7.2 MW
Free to lease27.6 MW
Utility feed56.3 MW
Campus / planned45 MW

About 49.1 MW of the utility feed is cooling, conversion, and house load.

Power cost

$88/kW·mo

9.6¢ industrial · 12¢ after PUE 1.25

Per MW·year
$1.1M
This site · 7.2 MW
$7.6M/yr
40 kW rack
$3,504/mo
3.2¢ cheapdear 22.4¢

3.0× the cheapest market (Iceland Landsvirkjun). Same IT load there is $5M/yr less.

TANGEDCO · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2026
Renewable match
30%
Rack density
40 kW
Voltage
PUE
1.251.00 ideal · 1.60 typical
Power source
TANGEDCO plus on-site generators. Dual feeds.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

40 kW

H100-eq

4k

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Direct-to-chip cold plates and rear-door heat exchangers. Designed for GB200/Blackwell-class racks.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Chennai, Tamil Nadu, India

SIPCOT IT Park, Siruseri, Chennai

12.831°, 80.218° · Asia

Tenants / users

Hyperscale, AI clouds

Notes

45 MW AI-ready campus. Phase 1 7.2 MW live Feb 2026. STT India's fourth Chennai building.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.