Under construction
Colocation
Liquid cooling
Tier III

STT Chennai 4 Ambattur

STT GDC · Ambattur

Planned IT
18 MW
Free to lease
14.4 MW
$ / kW·mo
$97
White space
75k ft²

Inventory

20% occupied

Power

18 MWlive

14.4 MW to lease · 3.6 MW in use

White space

75k ft²total

60k ft² free · 15k ft² occupied

6,968 m² · 5,574 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease14.4 MW
Utility feed
Campus / planned18 MW

Power cost

$97/kW·mo

9.6¢ industrial · 13.2¢ after PUE 1.38

Per MW·year
$1.2M
This site · 18 MW
$21M/yr
20 kW rack
$1,934/mo
3.2¢ cheapdear 22.4¢

3.0× the cheapest market (Iceland Landsvirkjun). Same IT load there is $14M/yr less.

TANGEDCO · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2027
Renewable match
30%
Rack density
20 kW
Voltage
PUE
1.381.00 ideal · 1.60 typical
Power source
TANGEDCO plus on-site generators. Dual feeds.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Chennai, Tamil Nadu, India

Ambattur campus, Chennai

13.116°, 80.156° · Asia

Tenants / users

Hyperscale, AI, cloud

Notes

Broke ground 2026. Pushes Ambattur campus toward 130 MW with Chennai 2/3.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.