STT Cavite 2
STT GDC Philippines · Cavite
- IT live
- 12 MW
- Free to lease
- 2.2 MW
- $ / kW·mo
- $125
- White space
- 142k ft²
Inventory
82% occupiedPower
12 MWlive
2.2 MW to lease · 9.8 MW in use
White space
142k ft²total
12k ft² free · 130k ft² occupied
13k m² · 1,140 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 13 MW of the utility feed is cooling, conversion, and house load.
Power cost
$125/kW·mo
12.4¢ industrial · 17.1¢ after PUE 1.38
- Per MW·year
- $1.5M
- This site · 12 MW
- $18M/yr
- 12 kW rack
- $1,499/mo
3.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $13M/yr less.
Meralco / NGCP · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2026
- Renewable match
- 20%
- Rack density
- 12 kW
- PUE
- 1.381.00 ideal · 1.60 typical
- Power source
- Meralco / NGCP. Dual feeds plus on-site generators. Typhoon-rated plant.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
12 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
3Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Dasmariñas, Cavite, Philippines
Cavite, Philippines
14.327°, 120.936° · Asia
Tenants / users
Cloud, enterprise, Globe on-net
Notes
Phase 1 ready-for-service 2026 with live customer deployments. 40.5 MW renewable contract through 2035 for the Globe/STT platform.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.