Expanding
Colocation
Liquid cooling
Tier III

STT Cavite 2

STT GDC Philippines · Cavite

IT live
12 MW
Free to lease
2.2 MW
$ / kW·mo
$125
White space
142k ft²

Inventory

82% occupied

Power

12 MWlive

2.2 MW to lease · 9.8 MW in use

White space

142k ft²total

12k ft² free · 130k ft² occupied

13k m² · 1,140 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live12 MW
Free to lease2.2 MW
Utility feed25 MW
Campus / planned20 MW

About 13 MW of the utility feed is cooling, conversion, and house load.

Power cost

$125/kW·mo

12.4¢ industrial · 17.1¢ after PUE 1.38

Per MW·year
$1.5M
This site · 12 MW
$18M/yr
12 kW rack
$1,499/mo
3.2¢ cheapdear 22.4¢

3.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $13M/yr less.

Meralco / NGCP · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2026
Renewable match
20%
Rack density
12 kW
PUE
1.381.00 ideal · 1.60 typical
Power source
Meralco / NGCP. Dual feeds plus on-site generators. Typhoon-rated plant.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

12 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

3

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Dasmariñas, Cavite, Philippines

Cavite, Philippines

14.327°, 120.936° · Asia

Tenants / users

Cloud, enterprise, Globe on-net

Notes

Phase 1 ready-for-service 2026 with live customer deployments. 40.5 MW renewable contract through 2035 for the Globe/STT platform.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.