STT Bangkok 2 Hua Mak
STT GDC · Hua Mak
- IT live
- 8 MW
- Free to lease
- 1.4 MW
- $ / kW·mo
- $98
- White space
- 107k ft²
Inventory
82% occupiedPower
8 MWlive
1.4 MW to lease · 6.6 MW in use
White space
107k ft²total
5,143 ft² free · 102k ft² occupied
9,954 m² · 478 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 22 MW of the utility feed is cooling, conversion, and house load.
Power cost
$98/kW·mo
10.2¢ industrial · 13.5¢ after PUE 1.32
- Per MW·year
- $1.2M
- This site · 8 MW
- $9.4M/yr
- 25 kW rack
- $2,457/mo
3.2× the cheapest market (Iceland Landsvirkjun). Same IT load there is $6.5M/yr less.
EGAT / PEA · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2026
- Renewable match
- 20%
- Rack density
- 25 kW
- PUE
- 1.321.00 ideal · 1.60 typical
- Power source
- MEA / PEA / EGAT. Dual feeds plus on-site generators.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
25 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Direct-to-chip cold plates and rear-door heat exchangers. Designed for GB200/Blackwell-class racks.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Bangkok, Bangkok, Thailand
Hua Mak campus, Bangkok
13.758°, 100.632° · Asia
Tenants / users
Hyperscale, AI, cloud
Notes
Same campus as BKK1. First phase 2026, 24 MW in 2027. 30–40 percent committed at launch, mostly existing hyperscale/AI customers.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.