Expanding
Colocation
Liquid cooling
Tier III

STT Bangkok 2 Hua Mak

STT GDC · Hua Mak

IT live
8 MW
Free to lease
1.4 MW
$ / kW·mo
$98
White space
107k ft²

Inventory

82% occupied

Power

8 MWlive

1.4 MW to lease · 6.6 MW in use

White space

107k ft²total

5,143 ft² free · 102k ft² occupied

9,954 m² · 478 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live8 MW
Free to lease1.4 MW
Utility feed30 MW
Campus / planned24 MW

About 22 MW of the utility feed is cooling, conversion, and house load.

Power cost

$98/kW·mo

10.2¢ industrial · 13.5¢ after PUE 1.32

Per MW·year
$1.2M
This site · 8 MW
$9.4M/yr
25 kW rack
$2,457/mo
3.2¢ cheapdear 22.4¢

3.2× the cheapest market (Iceland Landsvirkjun). Same IT load there is $6.5M/yr less.

EGAT / PEA · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2026
Renewable match
20%
Rack density
25 kW
PUE
1.321.00 ideal · 1.60 typical
Power source
MEA / PEA / EGAT. Dual feeds plus on-site generators.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

25 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Direct-to-chip cold plates and rear-door heat exchangers. Designed for GB200/Blackwell-class racks.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Bangkok, Bangkok, Thailand

Hua Mak campus, Bangkok

13.758°, 100.632° · Asia

Tenants / users

Hyperscale, AI, cloud

Notes

Same campus as BKK1. First phase 2026, 24 MW in 2027. 30–40 percent committed at launch, mostly existing hyperscale/AI customers.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.