Expanding
Colocation
Liquid cooling
Tier III

Stream Richardson

Stream Data Centers · DFW Richardson

IT live
36 MW
Free to lease
4.3 MW
$ / kW·mo
$60
White space
313k ft²

Inventory

88% occupied

Power

36 MWlive

4.3 MW to lease · 31.7 MW in use

White space

313k ft²total

18k ft² free · 295k ft² occupied

29k m² · 1,672 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live36 MW
Free to lease4.3 MW
Utility feed75 MW
Campus / planned60 MW

About 39 MW of the utility feed is cooling, conversion, and house load.

Power cost

$60/kW·mo

6.6¢ industrial · 8.3¢ after PUE 1.25

Per MW·year
$723k
This site · 36 MW
$26M/yr
20 kW rack
$1,205/mo
3.2¢ cheapdear 22.4¢

2.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $13M/yr less.

ERCOT North · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2012
Renewable match
35%
Rack density
20 kW
PUE
1.251.00 ideal · 1.60 typical
Power source
Oncor / ERCOT. Dual 138 kV or 34.5 kV plus on-site diesel.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Richardson, Texas, United States

Richardson, TX

32.948°, -96.730° · North America

Tenants / users

Hyperscale, cloud, enterprise

Notes

North Dallas wholesale campus. Family-owned Texas platform. Complements Aligned Plano and Equinix DA.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.