Planned
Colocation
Liquid cooling
Tier III

Start Campus Sines (end-state)

Start Campus · Sines Data Campus

Planned IT
1.2 GW
Free to lease
1.2 GW
$ / kW·mo
$87
White space
2.4M ft²

Inventory

0% occupied

Power

1.2 GWlive

1.2 GW to lease · 0 MW in use

White space

2.4M ft²total

2.4M ft² free · — occupied

223k m² · 223k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live—
Free to lease1.2 GW
Utility feed—
Campus / planned1.2 GW

Power cost

$87/kW·mo

10.8¢ industrial · 11.9¢ after PUE 1.10

Per MW·year
$1M
This site · 1.2 GW
$1.2B/yr
100 kW rack
$8,672/mo
3.2¢ cheapdear 22.4¢

3.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $879M/yr less.

Portugal Sines / Start Campus · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2031
Renewable match
100%
Rack density
100 kW
PUE
1.101.00 ideal · 1.60 typical
Power source
Fully permitted 1.2 GW interconnection on the Sines energy corridor.

Cooling

Plant

Seawater

Liquid

Deployed

Rack density

100 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Campus-scale seawater cooling. Powered shell, turn-key, and build-to-suit halls.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

3

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Sines, Setúbal, Portugal

SINES Data Campus, Sines, Portugal

37.954°, -8.868° · Europe

Tenants / users

Microsoft, Nscale, hyperscale pipeline

Notes

Six-building 1.2 GW campus. Largest digital-infrastructure investment in Portugal (~€8.5bn). SIN03–SIN06 are the remaining 989 MW of planned halls.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.