Start Campus Sines (end-state)
Start Campus · Sines Data Campus
- Planned IT
- 1.2 GW
- Free to lease
- 1.2 GW
- $ / kW·mo
- $87
- White space
- 2.4M ft²
Inventory
0% occupiedPower
1.2 GWlive
1.2 GW to lease · 0 MW in use
White space
2.4M ft²total
2.4M ft² free · — occupied
223k m² · 223k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$87/kW·mo
10.8¢ industrial · 11.9¢ after PUE 1.10
- Per MW·year
- $1M
- This site · 1.2 GW
- $1.2B/yr
- 100 kW rack
- $8,672/mo
3.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $879M/yr less.
Portugal Sines / Start Campus · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2031
- Renewable match
- 100%
- Rack density
- 100 kW
- PUE
- 1.101.00 ideal · 1.60 typical
- Power source
- Fully permitted 1.2 GW interconnection on the Sines energy corridor.
Cooling
Plant
Seawater
Liquid
Deployed
Rack density
100 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Campus-scale seawater cooling. Powered shell, turn-key, and build-to-suit halls.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
3Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Sines, Setúbal, Portugal
SINES Data Campus, Sines, Portugal
37.954°, -8.868° · Europe
Tenants / users
Microsoft, Nscale, hyperscale pipeline
Notes
Six-building 1.2 GW campus. Largest digital-infrastructure investment in Portugal (~€8.5bn). SIN03–SIN06 are the remaining 989 MW of planned halls.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.