Under construction
Neocloud
Liquid cooling
Tier III

Start Campus SIN02

Start Campus / Nscale · Sines Data Campus

Planned IT
200 MW
Remaining
200 MW
$ / kW·mo
$87
White space
400k ft²

Inventory

0% occupied

Power

200 MWcampus

200 MW pipeline · 0 MW in use

White space

400k ft²total

400k ft² free · — occupied

37k m² · 37k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live—
Remaining200 MW
Utility feed—
Campus / planned200 MW

Power cost

$87/kW·mo

10.8¢ industrial · 11.9¢ after PUE 1.10

Per MW·year
$1M
This site · 200 MW
$208M/yr
100 kW rack
$8,672/mo
3.2¢ cheapdear 22.4¢

3.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $146M/yr less.

Portugal Sines / Start Campus · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2027
Renewable match
100%
Rack density
100 kW
PUE
1.101.00 ideal · 1.60 typical
Power source
Portuguese grid plus renewable PPAs. Shared campus infrastructure with SIN01.

Cooling

Plant

Seawater

Liquid

Deployed

Rack density

100 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Second 200 MW hall. Direct-to-chip for Nvidia Vera Rubin NVL72. Seawater heat rejection.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

2

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Sines, Setúbal, Portugal

SINES Data Campus, Sines, Portugal

37.958°, -8.872° · Europe

Tenants / users

Microsoft, Nscale

Notes

Nscale investing €465m in this hall plus €230m shared plant. 66,000+ Rubin GPUs for Microsoft from late 2027. Campus permitted to 1.2 GW across six buildings.