Start Campus SIN02
Start Campus / Nscale · Sines Data Campus
- Planned IT
- 200 MW
- Remaining
- 200 MW
- $ / kW·mo
- $87
- White space
- 400k ft²
Inventory
0% occupiedPower
200 MWcampus
200 MW pipeline · 0 MW in use
White space
400k ft²total
400k ft² free · — occupied
37k m² · 37k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
Power cost
$87/kW·mo
10.8¢ industrial · 11.9¢ after PUE 1.10
- Per MW·year
- $1M
- This site · 200 MW
- $208M/yr
- 100 kW rack
- $8,672/mo
3.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $146M/yr less.
Portugal Sines / Start Campus · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2027
- Renewable match
- 100%
- Rack density
- 100 kW
- PUE
- 1.101.00 ideal · 1.60 typical
- Power source
- Portuguese grid plus renewable PPAs. Shared campus infrastructure with SIN01.
Cooling
Plant
Seawater
Liquid
Deployed
Rack density
100 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Second 200 MW hall. Direct-to-chip for Nvidia Vera Rubin NVL72. Seawater heat rejection.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
2Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Sines, Setúbal, Portugal
SINES Data Campus, Sines, Portugal
37.958°, -8.872° · Europe
Tenants / users
Microsoft, Nscale
Notes
Nscale investing €465m in this hall plus €230m shared plant. 66,000+ Rubin GPUs for Microsoft from late 2027. Campus permitted to 1.2 GW across six buildings.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.