OpenAI Stargate Abilene
Oracle / Crusoe / OpenAI · Stargate
- IT live
- 400 MW
- Remaining
- 1.2 GW
- $ / kW·mo
- $55
- White space
- 800k ft²
Inventory
33% occupiedPower
1.2 GWcampus
1.2 GW pipeline · 400 MW in use
White space
3.2M ft²total
2.4M ft² free · 800k ft² occupied
297k m² · 223k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 800 MW of the utility feed is cooling, conversion, and house load.
Power cost
$55/kW·mo
6.6¢ industrial · 7.6¢ after PUE 1.15
- Per MW·year
- $665k
- This site · 400 MW
- $266M/yr
- 120 kW rack
- $6,649/mo
2.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $137M/yr less.
ERCOT industrial · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2025
- Renewable match
- 30%
- Rack density
- 120 kW
- PUE
- 1.151.00 ideal · 1.60 typical
- Power source
- ERCOT plus on-site gas and solar pipeline.
Cooling
Plant
Direct-to-chip
Liquid
Deployed
Rack density
120 kW
H100-eq
509k
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Direct-to-chip on GB200 NVL72. Crusoe operating the AI factory for the OpenAI/Oracle Stargate program.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
2Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Abilene, Texas, United States
Abilene, Taylor County, TX
32.449°, -99.733° · North America
Tenants / users
OpenAI, Oracle
Notes
First Stargate site. Campus targeting 1.2 GW of IT load.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.