Under construction
Neocloud
Liquid cooling
Tier III

OpenAI Stargate Abilene

Oracle / Crusoe / OpenAI · Stargate

IT live
400 MW
Remaining
1.2 GW
$ / kW·mo
$55
White space
800k ft²

Inventory

33% occupied

Power

1.2 GWcampus

1.2 GW pipeline · 400 MW in use

White space

3.2M ft²total

2.4M ft² free · 800k ft² occupied

297k m² · 223k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live400 MW
Remaining1.2 GW
Utility feed1.2 GW
Campus / planned1.2 GW

About 800 MW of the utility feed is cooling, conversion, and house load.

Power cost

$55/kW·mo

6.6¢ industrial · 7.6¢ after PUE 1.15

Per MW·year
$665k
This site · 400 MW
$266M/yr
120 kW rack
$6,649/mo
3.2¢ cheapdear 22.4¢

2.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $137M/yr less.

ERCOT industrial · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2025
Renewable match
30%
Rack density
120 kW
PUE
1.151.00 ideal · 1.60 typical
Power source
ERCOT plus on-site gas and solar pipeline.

Cooling

Plant

Direct-to-chip

Liquid

Deployed

Rack density

120 kW

H100-eq

509k

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Direct-to-chip on GB200 NVL72. Crusoe operating the AI factory for the OpenAI/Oracle Stargate program.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

2

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Abilene, Texas, United States

Abilene, Taylor County, TX

32.449°, -99.733° · North America

Tenants / users

OpenAI, Oracle

Notes

First Stargate site. Campus targeting 1.2 GW of IT load.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.