Expanding
Colocation
Liquid cooling
Tier III

STACK Stockholm (ex DigiPlex)

STACK Infrastructure · Stockholm

IT live
24 MW
Free to lease
2.9 MW
$ / kW·mo
$64
White space
256k ft²

Inventory

88% occupied

Power

24 MWlive

2.9 MW to lease · 21.1 MW in use

White space

256k ft²total

16k ft² free · 239k ft² occupied

24k m² · 1,520 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live24 MW
Free to lease2.9 MW
Utility feed45 MW
Campus / planned36 MW

About 21 MW of the utility feed is cooling, conversion, and house load.

Power cost

$64/kW·mo

6.8¢ industrial · 8.7¢ after PUE 1.28

Per MW·year
$762k
This site · 24 MW
$18M/yr
12 kW rack
$762/mo
3.2¢ cheapdear 22.4¢

2.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $9.7M/yr less.

Sweden SE3 · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2012
Renewable match
100%
Rack density
12 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
Svenska kraftnät / Vattenfall. Dual feeds. Hydro-nuclear Swedish grid.

Cooling

Plant

Free air

Liquid

Deployed

Rack density

12 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

3

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Stockholm, Stockholm, Sweden

Greater Stockholm

59.348°, 18.004° · Europe

Tenants / users

Enterprise, cloud, networks, HPC

Notes

Former DigiPlex Stockholm, now STACK EMEA. Hydro-powered wholesale next to Equinix SK and Interxion STO.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.