Expanding
Colocation
Liquid cooling
Tier III

STACK Silicon Valley

STACK Infrastructure · SVY

IT live
36 MW
Free to lease
4.3 MW
$ / kW·mo
$120
White space
293k ft²

Inventory

88% occupied

Power

36 MWlive

4.3 MW to lease · 31.7 MW in use

White space

293k ft²total

17k ft² free · 276k ft² occupied

27k m² · 1,568 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live36 MW
Free to lease4.3 MW
Utility feed75 MW
Campus / planned60 MW

About 39 MW of the utility feed is cooling, conversion, and house load.

Power cost

$120/kW·mo

12.8¢ industrial · 16.4¢ after PUE 1.28

Per MW·year
$1.4M
This site · 36 MW
$52M/yr
22 kW rack
$2,631/mo
3.2¢ cheapdear 22.4¢

4.0× the cheapest market (Iceland Landsvirkjun). Same IT load there is $39M/yr less.

PG&E CAISO · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2019
Renewable match
60%
Rack density
22 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
PG&E. Dual 21 kV / 115 kV. CAISO.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

22 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

San Jose, California, United States

Silicon Valley, CA

37.371°, -121.921° · North America

Tenants / users

Hyperscale, cloud, enterprise

Notes

Bay Area STACK wholesale. Complements Equinix SV. Constrained CAISO interconnection.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.