STACK Portland HIL
STACK Infrastructure · Hillsboro
- IT live
- 48 MW
- Free to lease
- 7.2 MW
- $ / kW·mo
- $51
- White space
- 171k ft²
Inventory
85% occupiedPower
48 MWlive
7.2 MW to lease · 40.8 MW in use
White space
171k ft²total
26k ft² free · 146k ft² occupied
16k m² · 2,389 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 12 MW of the utility feed is cooling, conversion, and house load.
Power cost
$51/kW·mo
5.8¢ industrial · 7¢ after PUE 1.20
- Per MW·year
- $610k
- This site · 48 MW
- $29M/yr
- 25 kW rack
- $1,270/mo
1.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $13M/yr less.
PGE / BPA · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2019
- Renewable match
- 80%
- Rack density
- 25 kW
- PUE
- 1.201.00 ideal · 1.60 typical
- Power source
- PGE plus BPA hydro.
Cooling
Plant
Evaporative
Liquid
Deployed
Rack density
25 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Evaporative baseline with liquid-ready expansion halls for AI tenants.
Network carriers
3On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Hillsboro, Oregon, United States
Hillsboro, OR
45.535°, -122.968° · North America
Tenants / users
Cloud, AI
Notes
Hillsboro is a growing Pacific Northwest interconnection and hyperscale market.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.