Operational
Colocation
Liquid cooling
Tier III

STACK Portland HIL

STACK Infrastructure · Hillsboro

IT live
48 MW
Free to lease
7.2 MW
$ / kW·mo
$51
White space
171k ft²

Inventory

85% occupied

Power

48 MWlive

7.2 MW to lease · 40.8 MW in use

White space

171k ft²total

26k ft² free · 146k ft² occupied

16k m² · 2,389 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live48 MW
Free to lease7.2 MW
Utility feed60 MW
Campus / planned96 MW

About 12 MW of the utility feed is cooling, conversion, and house load.

Power cost

$51/kW·mo

5.8¢ industrial · 7¢ after PUE 1.20

Per MW·year
$610k
This site · 48 MW
$29M/yr
25 kW rack
$1,270/mo
3.2¢ cheapdear 22.4¢

1.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $13M/yr less.

PGE / BPA · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2019
Renewable match
80%
Rack density
25 kW
PUE
1.201.00 ideal · 1.60 typical
Power source
PGE plus BPA hydro.

Cooling

Plant

Evaporative

Liquid

Deployed

Rack density

25 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Evaporative baseline with liquid-ready expansion halls for AI tenants.

Network carriers

3

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Hillsboro, Oregon, United States

Hillsboro, OR

45.535°, -122.968° · North America

Tenants / users

Cloud, AI

Notes

Hillsboro is a growing Pacific Northwest interconnection and hyperscale market.

Operator site