Expanding
Colocation
Liquid cooling
Tier III

STACK NVA02 Manassas

STACK Infrastructure · NVA02

IT live
118 MW
Free to lease
14.2 MW
$ / kW·mo
$68
White space
703k ft²

Inventory

88% occupied

Power

118 MWlive

14.2 MW to lease · 104 MW in use

White space

703k ft²total

44k ft² free · 659k ft² occupied

65k m² · 4,111 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live118 MW
Free to lease14.2 MW
Utility feed225 MW
Campus / planned180 MW

About 107 MW of the utility feed is cooling, conversion, and house load.

Power cost

$68/kW·mo

7.3¢ industrial · 9.3¢ after PUE 1.28

Per MW·year
$819k
This site · 118 MW
$97M/yr
30 kW rack
$2,046/mo
3.2¢ cheapdear 22.4¢

2.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $54M/yr less.

Northern Virginia / Dominion · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2021
Renewable match
50%
Rack density
30 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
Dominion Energy. Dual 34.5 kV inlets plus on-site diesel. Northern Virginia PJM.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

30 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Manassas, Virginia, United States

Manassas, VA

38.751°, -77.475° · North America

Tenants / users

Hyperscale, cloud

Notes

118 MW live Manassas campus. IPI/Blue Owl wholesale. Largest STACK US hall in this load.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.