STACK NVA02 Manassas
STACK Infrastructure · NVA02
- IT live
- 118 MW
- Free to lease
- 14.2 MW
- $ / kW·mo
- $68
- White space
- 703k ft²
Inventory
88% occupiedPower
118 MWlive
14.2 MW to lease · 104 MW in use
White space
703k ft²total
44k ft² free · 659k ft² occupied
65k m² · 4,111 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 107 MW of the utility feed is cooling, conversion, and house load.
Power cost
$68/kW·mo
7.3¢ industrial · 9.3¢ after PUE 1.28
- Per MW·year
- $819k
- This site · 118 MW
- $97M/yr
- 30 kW rack
- $2,046/mo
2.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $54M/yr less.
Northern Virginia / Dominion · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2021
- Renewable match
- 50%
- Rack density
- 30 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- Dominion Energy. Dual 34.5 kV inlets plus on-site diesel. Northern Virginia PJM.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
30 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Manassas, Virginia, United States
Manassas, VA
38.751°, -77.475° · North America
Tenants / users
Hyperscale, cloud
Notes
118 MW live Manassas campus. IPI/Blue Owl wholesale. Largest STACK US hall in this load.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.