Under construction
Colocation
Liquid cooling
Tier III

STACK Project Jupiter

STACK Infrastructure · Doña Ana

Planned IT
400 MW
Free to lease
400 MW
$ / kW·mo
$60
White space
1M ft²

Inventory

0% occupied

Power

400 MWlive

400 MW to lease · 0 MW in use

White space

1M ft²total

1M ft² free · — occupied

93k m² · 93k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live—
Free to lease400 MW
Utility feed—
Campus / planned400 MW

Power cost

$60/kW·mo

6.4¢ industrial · 8.2¢ after PUE 1.28

Per MW·year
$718k
This site · 400 MW
$287M/yr
40 kW rack
$2,392/mo
3.2¢ cheapdear 22.4¢

2.0× the cheapest market (Iceland Landsvirkjun). Same IT load there is $144M/yr less.

El Paso Electric · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2026
Renewable match
30%
Rack density
40 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
El Paso Electric / WECC. Dual feeds. Project Jupiter campus interconnection.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

40 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Doña Ana, New Mexico, United States

Doña Ana County, NM

32.281°, -106.763° · North America

Tenants / users

Oracle / OpenAI Stargate (reported)

Notes

Stargate Doña Ana / Project Jupiter. First phase tracked at 400 MW IT; full published campus is multi-GW. Bloom SOFC overlay reported 2026. Not live capacity. Update 2026-10-28: Clayco and Kiewit topped out the first 855,000 sq ft building in late Oct 2026 (ground broken Oct 2025); phase 1 (about 400 acres) targeted Q3 2028; Green Chile gas pipeline in-service date slipped to Feb 2027 and air permit hearing set for Dec 2026. Source: https://constructionreviewonline.com/first-building-tops-out-at-the-165bn-project-jupiter-data-center-campus-in-new-mexico/

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.