Expanding
Colocation
Liquid cooling
Tier III

SK Pyeongtaek Campus

SK Inc. / SK Broadband · Pyeongtaek

IT live
40 MW
Free to lease
60 MW
$ / kW·mo
$93
White space
100k ft²

Inventory

0% occupied

Power

40 MWlive

60 MW to lease · 0 MW in use

White space

100k ft²total

150k ft² free · occupied

9,290 m² · 14k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live40 MW
Free to lease60 MW
Utility feed150 MW
Campus / planned120 MW

About 110 MW of the utility feed is cooling, conversion, and house load.

Power cost

$93/kW·mo

10.6¢ industrial · 12.7¢ after PUE 1.20

Per MW·year
$1.1M
This site · 40 MW
$45M/yr
40 kW rack
$3,714/mo
3.2¢ cheapdear 22.4¢

3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $31M/yr less.

KEPCO industrial · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2022
Renewable match
40%
Rack density
40 kW
PUE
1.201.00 ideal · 1.60 typical
Power source
KEPCO. Dual utility feeds.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

40 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Direct-to-chip cold plates and rear-door heat exchangers. Designed for GB200/Blackwell-class racks.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Pyeongtaek, Gyeonggi, South Korea

Pyeongtaek, Gyeonggi

36.990°, 127.110° · Asia

Tenants / users

Hyperscale, AI, SK Telecom cloud

Notes

SK's Pyeongtaek hyperscale campus. Among Korea's largest published DC land banks.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.