Under construction
Colocation
Liquid cooling
Tier III

Selectel Yurlovsky

Selectel · Yurlovsky

Planned IT
20 MW
Free to lease
20 MW
$ / kW·mo
$53
White space
100k ft²

Inventory

0% occupied

Power

20 MWlive

20 MW to lease · 0 MW in use

White space

100k ft²total

100k ft² free · occupied

9,290 m² · 9,290 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease20 MW
Utility feed
Campus / planned20 MW

Power cost

$53/kW·mo

5.6¢ industrial · 7.3¢ after PUE 1.30

Per MW·year
$638k
This site · 20 MW
$13M/yr
15 kW rack
$797/mo
3.2¢ cheapdear 22.4¢

1.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $5.5M/yr less.

Mosenergosbyt · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2026
Renewable match
18%
Rack density
15 kW
Voltage
PUE
1.301.00 ideal · 1.60 typical
Power source
MOESK / Mosenergosbyt. Dual 10 kV inlets plus on-site diesel. Gas-heavy Moscow grid; nuclear from Rosenergoatom on the ring.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

15 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus high-density cages to 55 kW. Cold-wall / contained-aisle. Liquid-ready on request.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Moscow, Moscow, Russia

Yurlovsky proezd, Moscow

55.872°, 37.679° · Europe

Tenants / users

Cloud, wholesale, AI colo

Notes

New Moscow Selectel hall, ~20 MW, targeted 2026. Next capacity step after Berzarina.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.