Expanding
Colocation
Liquid cooling
Tier III

Selectel Dubrovka

Selectel · Dubrovka

IT live
12 MW
Free to lease
1.7 MW
$ / kW·mo
$51
White space
141k ft²

Inventory

86% occupied

Power

12 MWlive

1.7 MW to lease · 10.3 MW in use

White space

141k ft²total

11k ft² free · 130k ft² occupied

13k m² · 975 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live12 MW
Free to lease1.7 MW
Utility feed22.5 MW
Campus / planned18 MW

About 10.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$51/kW·mo

5.4¢ industrial · 7¢ after PUE 1.30

Per MW·year
$615k
This site · 12 MW
$7.4M/yr
10 kW rack
$512/mo
3.2¢ cheapdear 22.4¢

1.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $3M/yr less.

Lenenergo · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2016
Renewable match
22%
Rack density
10 kW
Voltage
PUE
1.301.00 ideal · 1.60 typical
Power source
Lenenergo / Rosseti. Dual feeds plus on-site diesel. Northwest grid.

Cooling

Plant

Free air

Liquid

Deployed

Rack density

10 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus high-density cages to 55 kW. Cold-wall / contained-aisle. Liquid-ready on request.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Dubrovka, Leningrad Oblast, Russia

Dubrovka, Leningrad Oblast

59.761°, 30.928° · Europe

Tenants / users

Selectel Cloud, wholesale, GPU

Notes

Dubrovka 1-3. Largest Selectel campus. Scale-out from the city Tsvetochnaya halls.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.