Scaleway DC5 Saint-Ouen-l'Aumône
Scaleway / OpCore · DC5
- IT live
- 22 MW
- Free to lease
- 2.4 MW
- $ / kW·mo
- $87
- White space
- 231k ft²
Inventory
89% occupiedPower
22 MWlive
2.4 MW to lease · 19.6 MW in use
White space
231k ft²total
12k ft² free · 219k ft² occupied
21k m² · 1,081 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 26 MW of the utility feed is cooling, conversion, and house load.
Power cost
$87/kW·mo
10.4¢ industrial · 12¢ after PUE 1.15
- Per MW·year
- $1M
- This site · 22 MW
- $23M/yr
- 16 kW rack
- $1,397/mo
3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $16M/yr less.
France Enedis / Ile-de-France · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2019
- Renewable match
- 100%
- Rack density
- 16 kW
- PUE
- 1.151.00 ideal · 1.60 typical
- Power source
- RTE / Enedis. Dual MV inlets plus on-site diesel. Nuclear-heavy French grid (ARENH).
Cooling
Plant
Evaporative
Liquid
Not deployed
Rack density
16 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Indirect adiabatic / EvaPack. No compressor chillers on IT halls. Ice-bank trim for peaks.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Saint-Ouen-l'Aumône, Île-de-France, France
25 rue de l'Eguillette, 95310 Saint-Ouen-l'Aumône
49.045°, 2.103° · Europe
Tenants / users
Hyperscale, Scaleway cloud, OCP suites 1-16 MW
Notes
Former La Poste sorting office. 12 independent vaults, dual 24 MW feeds. Indirect adiabatic, no compressor chillers on IT. Iliad's wholesale flagship. Complements DATA4 Saclay for Paris hyperscale.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.