Scaleway DC3 Vitry
Scaleway / OpCore · Vitry-sur-Seine
- IT live
- 8 MW
- Free to lease
- 0.9 MW
- $ / kW·mo
- $97
- White space
- 69k ft²
Inventory
89% occupiedPower
8 MWlive
0.9 MW to lease · 7.1 MW in use
White space
69k ft²total
6,111 ft² free · 63k ft² occupied
6,452 m² · 568 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 2 MW of the utility feed is cooling, conversion, and house load.
Power cost
$97/kW·mo
10.4¢ industrial · 13.3¢ after PUE 1.28
- Per MW·year
- $1.2M
- This site · 8 MW
- $9.3M/yr
- 8 kW rack
- $777/mo
3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $6.5M/yr less.
France Enedis / Ile-de-France · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2011
- Renewable match
- 100%
- Rack density
- 8 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- RTE / Enedis. Dual MV inlets plus on-site diesel. Nuclear-heavy French grid (ARENH).
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
8 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Chilled-water CRAH, N+1. Isolated hot aisles. Not an AI factory unless noted.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Vitry-sur-Seine, Île-de-France, France
61 rue Julian Grimau, 94400 Vitry-sur-Seine
48.785°, 2.390° · Europe
Tenants / users
Scaleway cloud, Dedibox, enterprise
Notes
Second Vitry hall. Pair to DC2. Iliad sovereign cloud, not a hyperscale factory.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.