Under construction
Colocation
Liquid cooling
Tier III

Scala MEX02 Queretaro

Scala Data Centers · Queretaro

Planned IT
36 MW
Free to lease
36 MW
$ / kW·mo
$89
White space
150k ft²

Inventory

0% occupied

Power

36 MWlive

36 MW to lease · 0 MW in use

White space

150k ft²total

150k ft² free · occupied

14k m² · 14k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease36 MW
Utility feed
Campus / planned36 MW

Power cost

$89/kW·mo

9.8¢ industrial · 12.3¢ after PUE 1.25

Per MW·year
$1.1M
This site · 36 MW
$39M/yr
20 kW rack
$1,789/mo
3.2¢ cheapdear 22.4¢

3.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $26M/yr less.

CFE Queretaro · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2027
Renewable match
40%
Rack density
20 kW
PUE
1.251.00 ideal · 1.60 typical
Power source
CFE. Dual 23 kV or 115 kV inlets plus on-site diesel. Mexican federal grid; interconnection queues are the constraint.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Queretaro, Queretaro, Mexico

Queretaro

20.568°, -100.354° · North America

Tenants / users

Hyperscale, cloud

Notes

Second Scala Mexico campus after Tepotzotlan MEX01. Brookfield. Queretaro scale-out from the State of Mexico beachhead.

Operator site