Expanding
Colocation
Liquid cooling
Tier III

Scala MEX01 Tepotzotlan

Scala Data Centers · Tepotzotlan

IT live
5 MW
Free to lease
0.6 MW
$ / kW·mo
$95
White space
144k ft²

Inventory

88% occupied

Power

5 MWlive

0.6 MW to lease · 4.4 MW in use

White space

144k ft²total

2,885 ft² free · 141k ft² occupied

13k m² · 268 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live5 MW
Free to lease0.6 MW
Utility feed30 MW
Campus / planned24 MW

About 25 MW of the utility feed is cooling, conversion, and house load.

Power cost

$95/kW·mo

10.2¢ industrial · 13.1¢ after PUE 1.28

Per MW·year
$1.1M
This site · 5 MW
$5.7M/yr
16 kW rack
$1,525/mo
3.2¢ cheapdear 22.4¢

3.2× the cheapest market (Iceland Landsvirkjun). Same IT load there is $3.9M/yr less.

CFE industrial · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2023
Renewable match
40%
Rack density
16 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
CFE. Dual 23 kV or 115 kV inlets plus on-site diesel. Mexican federal grid; interconnection queues are the constraint.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

16 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Tepotzotlan, State of Mexico, Mexico

Tepotzotlan, State of Mexico

19.721°, -99.224° · North America

Tenants / users

Hyperscale, cloud

Notes

Scala's first Mexico campus (Brookfield). TP01 5 MW live, scaling. Brazilian operator's NA beachhead.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.