Under construction
Colocation
Liquid cooling
Tier III

Scala Huechuraba

Scala Data Centers · Santiago

Planned IT
30 MW
Free to lease
24 MW
$ / kW·mo
$80
White space
125k ft²

Inventory

20% occupied

Power

30 MWlive

24 MW to lease · 6 MW in use

White space

125k ft²total

100k ft² free · 25k ft² occupied

12k m² · 9,290 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease24 MW
Utility feed
Campus / planned30 MW

Power cost

$80/kW·mo

industrial · 11¢ after PUE 1.22

Per MW·year
$962k
This site · 30 MW
$29M/yr
20 kW rack
$1,603/mo
3.2¢ cheapdear 22.4¢

2.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $19M/yr less.

Chile SING/SIC · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2026
Renewable match
90%
Rack density
20 kW
PUE
1.221.00 ideal · 1.60 typical
Power source
Chilean grid.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Liquid-ready wholesale. Estimated in service November 2026.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Huechuraba, Santiago Metropolitan, Chile

Huechuraba, Santiago

-33.370°, -70.640° · South America

Tenants / users

Hyperscale

Notes

Scala's Santiago campus, alongside AWS's Huechuraba region.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.