Planned
Colocation
Liquid cooling
Tier III

Scala AI City Eldorado do Sul

Scala Data Centers · AI City

Planned IT
4.8 GW
Free to lease
4.8 GW
$ / kW·mo
$86
White space
9.5M ft²

Inventory

0% occupied

Power

4.8 GWlive

4.8 GW to lease · 0 MW in use

White space

9.5M ft²total

9.5M ft² free · — occupied

883k m² · 883k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live—
Free to lease4.8 GW
Utility feed—
Campus / planned4.8 GW

Power cost

$86/kW·mo

10.2¢ industrial · 11.7¢ after PUE 1.15

Per MW·year
$1M
This site · 4.8 GW
$4.9B/yr
80 kW rack
$6,850/mo
3.2¢ cheapdear 22.4¢

3.2× the cheapest market (Iceland Landsvirkjun). Same IT load there is $3.3B/yr less.

Brazil industrial · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2029
Renewable match
100%
Rack density
80 kW
PUE
1.151.00 ideal · 1.60 typical
Power source
5 GW grid-connection authorization. First phase 54 MW disclosed. Southern Brazil hydro/wind.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

80 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Campus-scale liquid-ready AI city. Zero-WUE design goal (no cooling towers).

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Eldorado do Sul, Rio Grande do Sul, Brazil

Eldorado do Sul, RS

-29.998°, -51.306° · South America

Tenants / users

Hyperscale AI

Notes

One of the largest announced single campuses in the world. 4.75 GW end-state; 54 MW first phase. Treat later phases as pipeline.

Operator site