Satsumasendai AI Campus
Satsumasendai consortium · Circular Park Senda
- Planned IT
- 350 MW
- Free to lease
- 350 MW
- $ / kW·mo
- $144
- White space
- 700k ft²
Inventory
0% occupiedPower
350 MWlive
350 MW to lease · 0 MW in use
White space
700k ft²total
700k ft² free · — occupied
65k m² · 65k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$144/kW·mo
17.2¢ industrial · 19.8¢ after PUE 1.15
- Per MW·year
- $1.7M
- This site · 350 MW
- $606M/yr
- 80 kW rack
- $11,552/mo
5.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $494M/yr less.
Japan industrial · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2030
- Renewable match
- 70%
- Rack density
- 80 kW
- PUE
- 1.151.00 ideal · 1.60 typical
- Power source
- Kyushu Electric. Phased to 350 MW. Site agreement signed July 2026.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
80 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Campus-scale liquid-ready AI factory on a former industrial site.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
6Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Satsumasendai, Kagoshima, Japan
Former Circular Park / Sendai site, Kagoshima
31.813°, 130.304° · Asia
Tenants / users
Hyperscale pipeline
Notes
350 MW staged AI campus in Satsumasendai. Location agreement 2026. Early-stage.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.