Expanding
Colocation
Liquid cooling
Tier III

Sabey Quincy

Sabey Data Centers · Quincy

IT live
48 MW
Free to lease
5.8 MW
$ / kW·mo
$41
White space
417k ft²

Inventory

88% occupied

Power

48 MWlive

5.8 MW to lease · 42.2 MW in use

White space

417k ft²total

24k ft² free · 393k ft² occupied

39k m² · 2,230 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live48 MW
Free to lease5.8 MW
Utility feed100 MW
Campus / planned80 MW

About 52 MW of the utility feed is cooling, conversion, and house load.

Power cost

$41/kW·mo

4.8¢ industrial · 5.7¢ after PUE 1.18

Per MW·year
$496k
This site · 48 MW
$24M/yr
20 kW rack
$827/mo
3.2¢ cheapdear 22.4¢

1.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $7.9M/yr less.

Grant PUD hydro · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2007
Renewable match
95%
Rack density
20 kW
PUE
1.181.00 ideal · 1.60 typical
Power source
Grant PUD / BPA. Dual 115 kV. Columbia Basin hydro.

Cooling

Plant

Free air

Liquid

Deployed

Rack density

20 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Quincy, Washington, United States

Quincy, WA

47.241°, -119.842° · North America

Tenants / users

Hyperscale, cloud

Notes

Columbia Basin Sabey campus. Grant PUD hydro. Distinct from Vantage Quincy on the same plateau. Original Quincy wholesale pioneer.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.