Rostelecom Udomlya
Rostelecom-TsOD · Udomlya
- IT live
- 48 MW
- Free to lease
- 6.7 MW
- $ / kW·mo
- $33
- White space
- 568k ft²
Inventory
86% occupiedPower
48 MWlive
6.7 MW to lease · 41.3 MW in use
White space
568k ft²total
38k ft² free · 530k ft² occupied
53k m² · 3,547 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 52 MW of the utility feed is cooling, conversion, and house load.
Power cost
$33/kW·mo
3.8¢ industrial · 4.5¢ after PUE 1.18
- Per MW·year
- $393k
- This site · 48 MW
- $19M/yr
- 12 kW rack
- $393/mo
1.2× the cheapest market (Iceland Landsvirkjun). Same IT load there is $3M/yr less.
Rosenergoatom Kalinin · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2018
- Renewable match
- 5%
- Rack density
- 12 kW
- PUE
- 1.181.00 ideal · 1.60 typical
- Power source
- Rosenergoatom Kalinin NPP adjacency. Dedicated nuclear-backed interconnection at Udomlya.
Cooling
Plant
Free air
Liquid
Not deployed
Rack density
12 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Cold-climate free-air economization most of the year. Closed-loop dry coolers; no evaporative towers.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Udomlya, Tver Oblast, Russia
Udomlya, Tver Oblast (Kalinin NPP)
57.878°, 35.017° · Europe
Tenants / users
Hyperscale, government, Rostelecom
Notes
Nuclear-backed campus next to Kalinin NPP. One of the largest single Russian IT loads outside Moscow. Cheap firm power; winter free-air.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.