Riot Platforms Rockdale
Riot Platforms · Rockdale
- IT live
- 700 MW
- Remaining
- 0 MW
- $ / kW·mo
- $50
- White space
- 2.2M ft²
Inventory
100% occupiedPower
700 MWcampus
0 MW to commission · 700 MW in use
White space
2.2M ft²total
— free · 2.2M ft² occupied
203k m²
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
Power cost
$50/kW·mo
6.6¢ industrial · 6.8¢ after PUE 1.03
- Per MW·year
- $596k
- This site · 700 MW
- $417M/yr
- 30 kW rack
- $1,489/mo
2.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $215M/yr less.
ERCOT industrial · utility tariff × PUE, not colo list price.
- Redundancy
- N
- Opened
- 2020
- Renewable match
- 40%
- Rack density
- 30 kW
- PUE
- 1.031.00 ideal · 1.60 typical
- Power source
- ERCOT plus behind-the-meter industrial interconnection.
Cooling
Plant
Immersion
Liquid
Deployed
Rack density
30 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Single-phase and two-phase immersion on Bitcoin miners. Among the largest immersion deployments in North America.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Rockdale, Texas, United States
Milam County, TX
30.656°, -97.001° · North America
Tenants / users
Riot Platforms
Notes
Converted industrial load. Immersion cooling yields a PUE near 1.03.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.